What is a cost-plus contract versus a fixed-price contract?

A fixed-price contract sets one total for a defined scope, and the contractor carries the risk of going over on that scope. A cost-plus contract bills actual costs plus a fee, and you see every invoice and carry the cost risk. A guaranteed maximum price is the hybrid: cost-plus with a cap.

When each one fits

Fixed price works when the drawings and the finish selections are done, because you cannot fix a price on something nobody has decided yet. Cost-plus works when you want to start before design is finished, or when you are renovating an old building where what is behind the walls is genuinely unknown. A guaranteed maximum price suits developers who need a cap their lender will accept but still want open books.

What to watch in each

On fixed price, make sure the scope and the held amounts are specific. A low fixed price with vague scope is the most expensive contract in construction. On cost-plus, pin down the fee basis, the markup on subcontractors, and what counts as a reimbursable cost, and ask for a monthly open-book report. The fee is not where you get hurt; the definition of cost is.

Los Angeles County figures, reviewed 2026-10-29 by America General Contractors, California contractor licence CSLB 1083262. Planning ranges, not a quote, and not legal advice. We confirm the current rules for your parcel before anything gets drawn.

Related questions

Who does this work

Let's talk about your property.

Call, or send the address and what you want to do. We will walk it, confirm what the city allows, and send a written proposal with scope, cost and timeline.

(310) 734-2245Monday to Friday, 8am to 6pm · CSLB 1083262