Flooring in Los Angeles costs about $6 to $12 per square foot installed for luxury vinyl plank in 2026, $12 to $20 for engineered wood, $16 to $26 for site-finished solid oak and $14 to $28 for porcelain tile. Refinishing existing oak is $4 to $8 per square foot and is usually the best value in the whole category. A 1,500 square foot house runs $9,000 to $18,000 in vinyl plank or $24,000 to $39,000 in solid oak.

Luxury vinyl plank, installed
$6 to $12 per sq ftThe volume choice
Engineered wood, installed
$12 to $20 per sq ftReal wood over a stable core
Refinish existing oak
$4 to $8 per sq ftBest value if you have oak
Subfloor levelling
Adds $2 to $6 per sq ftFound after demolition

What it costs

WhatTypical Los Angeles rangeNotes
Luxury vinyl plank$6 to $12 per sq ftInstalled, including underlayment
Laminate$5 to $10 per sq ftCheaper, less water tolerant
Engineered wood$12 to $20 per sq ftGlue-down or floating
Solid oak, site-finished$16 to $26 per sq ftSand and finish in place
Refinish existing solid wood$4 to $8 per sq ftSand, stain, three coats
Porcelain or ceramic tile$14 to $28 per sq ftIncludes setting bed and grout
Large-format tile or slab$25 to $45 per sq ftNeeds a dead-flat substrate
Carpet$5 to $10 per sq ftIncluding pad and tack strip
Polished or sealed concrete$8 to $18 per sq ftDepends on the slab you start with
Demolition and haul-away$1.50 to $4 per sq ftMore for tile and thinset
Self-levelling compound$2 to $6 per sq ftWhere the subfloor is out of flat
1,500 sq ft house, vinyl plank$9,000 to $18,000Whole-house, one material
1,500 sq ft house, solid oak$24,000 to $39,000Site-finished

Work out your own number. The whole-house renovation cost calculator gives you a line-item range for your project in under a minute.

The line that is missing from most flooring quotes

Subfloor preparation. A flooring quote priced per square foot of material assumes the surface underneath is flat, dry and sound. In Los Angeles, on a 1925 house with a raised foundation that has settled, or a 1955 slab that has cracked and lifted, it frequently is not. That gets discovered on demolition day, after the old floor is in a dumpster and there is no option to stop.

Large-format tile and slab are the least forgiving: anything more than an eighth of an inch out of flat over ten feet will show as lippage between tiles, and the only fix is to level the substrate first. Floating floors are the most forgiving but will flex and click over a hollow. We check the subfloor before quoting where we can get at it, and where we cannot, we put a named allowance in the proposal instead of leaving it out.

  • Raised-foundation houses: expect sistered joists, shimming or new subfloor sheathing in places
  • Slab houses: expect grinding, crack isolation membrane or self-levelling compound
  • Tile over tile: possible, but it raises the floor height and all the door jambs have to be cut
  • Anything near a plumbing wall in an old house: expect to find a past leak

Which material for which room

Luxury vinyl plank

It is waterproof, it takes abuse, it goes over most substrates and it is the single most sensible choice for a rental, a basement-level room, or a family house with dogs and children. The good ones look genuinely convincing. The cheap ones telegraph every imperfection in the subfloor and dent under a chair leg, and the difference between the two is about three dollars a square foot.

Engineered and solid wood

Solid oak site-finished is the best-looking floor and the one that adds the most at resale in the pre-war parts of Los Angeles, where it is what the house originally had. It can also be sanded and refinished several times across its life, which nothing else in this list can. Engineered wood gets you a real wood surface with better dimensional stability, which matters for a glue-down over a slab.

Tile

The right answer in bathrooms, laundries and anywhere water lands, and a good answer for a whole ground floor in a Spanish or Mediterranean house. It is the most expensive to install because of the setting bed and the waterproofing, and the most expensive to remove later.

Refinishing what you already have

If the house has original oak under the carpet, which a surprising number of 1920s to 1950s Los Angeles houses do, refinishing at $4 to $8 a square foot beats every new floor on both cost and result. The first thing we do on a whole-house renovation in that era of house is pull up a corner of carpet and look.

What moves your number

  • Material grade within the same category, which is the biggest single variable
  • Subfloor condition, which is the biggest unknown
  • Pattern: herringbone, chevron and diagonal layouts add 20 to 40 percent to labour
  • Transitions, thresholds and stair nosings, which are slow detailed work
  • Removing and resetting baseboards against scribing the floor to them
  • Door jambs that have to be undercut for a thicker floor
  • Furniture moving and whether the house is occupied
  • Stairs, which are priced per tread, usually $80 to $250 each

Permits and the energy code

Flooring on its own does not need a permit in the City of Los Angeles. Replacing a floor covering is not an alteration the building code regulates. What does need one is the work that often comes with it: moving a wall, altering plumbing for a new tile shower pan, or putting in radiant heat.

There is one trap. If the existing floor is pre-1980 vinyl tile or sheet vinyl, the tile itself or the black mastic under it may contain asbestos. Removing it then becomes an abatement job with its own rules, done by a licensed abatement contractor before flooring starts. Testing costs a couple of hundred dollars and is worth doing on any pre-1980 house before anyone starts prying.

Los Angeles County figures, reviewed 2026-10-29 by America General Contractors, California contractor licence CSLB 1083262. Planning ranges, not a quote, and not legal advice. We confirm the current rules for your parcel before anything is drawn.

Questions

What is the cheapest flooring that still looks good in Los Angeles?

Mid-grade luxury vinyl plank at $8 to $10 a square foot installed. Below about $6 a square foot the wear layer gets thin and the embossing gets repetitive enough that you notice the pattern repeating across a room. If the house already has oak under the carpet, refinishing it is cheaper than that and looks far better.

Can I put new flooring over my existing floor?

Over vinyl or tile, often yes, and it saves the demolition and disposal cost. The two constraints are height and flatness: the floor gets thicker, so door jambs need undercutting and transitions to adjacent rooms have to work, and any hollow or lippage underneath will come through. Over carpet, never.

How long does a whole-house flooring job take?

Three to five days for vinyl plank or engineered wood on a 1,500 square foot house, plus a day for demolition. Site-finished solid oak is seven to ten days because of the sanding and three coats of finish, with a day of cure before furniture goes back. Tile is the slowest, at one to two weeks, because of the setting and grouting sequence.

Is engineered wood as good as solid wood?

For stability over a slab or in a room with humidity swings, it is better. For longevity, solid wins: a three-quarter-inch solid oak floor can be sanded four or five times across a century, while most engineered floors have a wear layer good for one or two. If you are staying thirty years in a pre-war house, solid is the better purchase.

Do you have to replace flooring throughout for it to look right?

No, but the transitions have to be deliberate. A single material running through the public rooms with a clean threshold at the bedrooms reads as a design decision. The same material stopping halfway through a room reads as running out of money. We draw the transitions before ordering.

Related reading

More on this

Who does this work

Let's talk about your property.

Call, or send the address and what you want to do. We will walk it, confirm what the city allows, and send a written proposal with scope, cost and timeline.

(310) 734-2245Monday to Friday, 8am to 6pm · CSLB 1083262