Cost ranges by project
| Project | Typical LA County range | Main cost drivers |
|---|---|---|
| Cosmetic bathroom refresh | $10,000 to $25,000 | Fixture grade, tile scope |
| Full bathroom remodel | $25,000 to $60,000 | Layout changes, custom shower, stone |
| Cosmetic kitchen refresh | $20,000 to $40,000 | Counters, appliances |
| Full kitchen remodel | $35,000 to $100,000 | Cabinet grade, moved plumbing, structure |
| Ground-floor addition | $300 to $500 per sq ft | Bathroom included, matching exterior |
| Second-story addition | $400 to $600 per sq ft | Structural upgrades below, roof removal |
| Garage conversion ADU | $120,000 to $150,000 | Slab condition, utilities |
| Detached ADU | $150,000 to $400,000 | Size, finish, site access, sewer |
| Whole-house cosmetic | $60 to $120 per sq ft | Paint, floors, fixtures |
| Whole-house replacement | $150 to $300 per sq ft | Systems, kitchens, baths |
| Whole-house gut renovation | $300 to $600 per sq ft | Structure, finish level |
| Bolt and brace retrofit | $3,000 to $12,000 | Crawlspace access, wall length |
| Soft-story retrofit | $60,000 to $200,000+ | Frames, parking layout |
| Exterior paint | $8,000 to $20,000 | Height, prep, stucco condition |
| Re-stucco | $15,000 to $40,000 | Finish type, lath replacement |
| Composition reroof | $15,000 to $35,000 | Pitch, layers, sheathing |
| 200-amp panel upgrade | $3,500 to $7,500 | Utility coordination |
| Whole-house repipe | $8,000 to $20,000 | Size, access, material |
| Central HVAC replacement | $12,000 to $25,000 | Ductwork, heat pump versus gas |
What moves every number
- Age of the building and what is behind the walls
- Whether plumbing, electrical and structure stay in place
- Finish selections, which can double a kitchen or bath budget
- Permit scope and jurisdiction
- Access, hillside conditions and occupied versus vacant
How to budget
Settle the scope and finishes before pricing, hold a 10 to 15 percent contingency on pre-1970 homes, get a line-item proposal with allowances for anything unselected, and expect written change orders for anything outside scope. Doing several projects at once is almost always cheaper than doing them one at a time.
Los Angeles County figures, updated 2026-10-29. Planning ranges, not a quote, and not legal advice. Rules change, so we confirm what applies to your property before design.
Related questions
- How much does a bathroom remodel cost in Los Angeles?
- How much does a room addition cost in Los Angeles?
- How much does an ADU cost in Los Angeles?
- How much does a full home renovation cost?
- What is a change order?
Who does this work

Kitchen & Bathroom Remodeling
New kitchens and bathrooms, from a weekend-level refresh to moving walls and plumbing.
Room Additions
More square footage: a bedroom, a primary suite, a bigger family room, or a whole second floor.